Launch NightSave my seat Fuel ClubJoin

Energy · Case study

How we Fueled Shell

We helped Shell design and start up a new digital oilfield by defining the work processes, people responsibilities, data feed and technology needed to operate Shell’s 1st Smart Field® on a remote island.

$50KUnder Budget
28 DaysAhead of Schedule

The challenge

Shell wanted to build a new oilfield with Insert Fuel. This required the latest tech and impossible engineering. We had to inject water 24/7 into the wells to produce oil. The plant needed 95% uptime at an insanely high water purity level of 90 ppm. Never been done before in the industry.

This required intricate data availability, advanced robotics, and real-time collaboration from specialists around the world. Response time needed to be in minutes, not days. To complicate things, this was a legacy oilfield from the 1920s. Poor infrastructure. On a remote island.

  • 24/7 Uptime Availability
  • Highly Complex Requirements

What we built

We got involved at an early stage consulting on digital strategy when the financial decision was being made to justify the entire oilfield investment. We defined the budget and field management plan, including operating policies and requirements for successful launch.

We aligned on protocols for exception handling, decision-making, troubleshooting and remote control.

We revamped work processes to be more efficient, taking a lot of waste out of the process to cut corners.

We learned what data was needed to monitor the uptime and availability of the wells.

We designed the user experience and built the technology and infrastructure needed.

We coached people on what it means to work as a virtual team and operate in the new normal.

  • $50K under budget
  • 28 days ahead of schedule
  • Project paid for itself within 6 months

What came of it

A sweeping transformation took place across the lines of people, process and technology that enabled the new oilfield to operate with speed and agility. The main deliverable was multiple collaborative work environment facilities, connecting the field and office for real-time collaboration, troubleshooting, and data sharing.

With Insert Fuel's help, Shell was able to maintain high production yield with record-breaking uptime, avoiding costly upsets that would disrupt country relations. 1 in every 5 lightbulbs in Tokyo was powered by Shell, so you can imagine.

Shell reports the project paid for itself within 6 months. Extremely fast positive ROI. Soon after, Insert Fuel was engaged to perform the same work in Malaysia, Australia, Holland and Saudi Arabia to replicate this success story as the new “gold” standard for digital oilfields worldwide. This is how a new digital oilfield was fueled to life.

Shell: How We Fueled Shell's Digital Oilfield Transformation
Share this storyJohn gets the spotlight, and whoever shares it gets the credit.